Packaging inserts
Name closed-cell or open-cell. Ask density in g/cc. Do not treat a craft-pack size as an industrial sheet size.
BUYER SUPPORT / FIRST ORDER
Compare quotes from up to 3 factories
FREE basic specification and sourcing-requirements review
Eligible first orders may receive up to 3%
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements. Final savings depend on supplier confirmation, product type and order value.
Same-basis factory request
US buyers often arrive with the search string better office products eva foam sheets. On this desk that wording is a request label, not a stocked retail SKU and not an affiliation with any office-supply brand. We turn it into one brief several factories can quote on thickness, density in g/cc, cell structure, quantity and destination.
Discuss Sample Needs
Packaging, OEM and industrial buyers can use the same axes. The factory still answers availability.
Name closed-cell or open-cell. Ask density in g/cc. Do not treat a craft-pack size as an industrial sheet size.
Parent sheet length and width travel with thickness. A photo of a neighbour part is a starting point, not a drawing.
Service temperature in °F or °C and the medium under the pad belong on the brief. Compression set is a factory test, not a site claim.
Ask liner type and whether the adhesive is for temporary or longer hold. Backing is not implied by density.
Roll width, length and core size are packing fields. They are not the same as a cut sheet count.
If the buyer only has a consumer catalogue string, say so. We ask factories whether they treat it as the same configuration or a different wall and size.
Ask density in g/cc or an equivalent density unit, plus the method. A colour or a “high density” adjective is not a number.
Write the substitution: what changed on thickness, density, cell structure, sheet size or adhesive. An equivalent offer that does not name the change is not yet comparable.
No published MOQ or clock lives on this site. Those fields come back on the factory reply and stay attached to the named configuration.
Same quantity, packing, Incoterms and document set. We do not recast a cheaper-looking number on a different Incoterm as a percentage saving.
Must name thickness and parent size. A family brochure is not enough.
Ask the method. Do not treat a plant ISO 9001 poster as the lot test.
The report should cite the method and the condition it was run under.
We send the same axes to more than one factory. You keep the specification decisions.